backlogging
英 [ˈbæklɒgɪŋ]
美 [ˈbæˌklɑgɪŋ]
网络 需求延迟; 积累; 拖后
双语例句
- A Vendor-Managed Inventory Model with Partial Backlogging Allowing Shortage
允许缺货且缺货量部分拖后的供应商管理库存 - An EOQ model is developed for deteriorating items with time-varying demand purchase price and partial backlogging under stock dependent selling rate and time-value of system cost.
基于需求和采购价均为时变的EOQ模型,进一步考虑时变短缺量拖后率以及资金时间价值等因素对变质物品库存管理的影响,建立了相应的EOQ模型。 - Based on the former EPQ models with partial backlogging, this paper develops an EPQ model with exponential time-varying demand and different productivities.
基于短缺量部分拖后的EPQ模型,考虑需求随时间指数增长以及缺货和现货期间生产率不相同对库存管理补充策略的影响,建立了相应的生产库存模型。 - An EOQ Model for Items with Partial Backlogging
缺货部分补充物品的EOQ模型 - Inventory Model of Deteriorating Items with Stock-Out Partial Backlogging; turn in as payment or part payment for a purchase.
缺货量部分拖后订货的易变质物品的库存模型卖掉旧物作为购买新物的全部或部分货款。 - ( Q, r) inventory model with random lead time and partial backlogging
随机提前时间缺货部分补充的(Q,r)存储模型 - Backlogging your changes until you have time to update them causes confusion and time delays.
不进行改变,而是积压需要改变的地方直到你有时间去更新你的设计会导致混乱和时间延迟。 - An EOQ Model for Non-instantaneous Replenishment with Partial Backlogging
部分短缺量拖后的非瞬时补货的EOQ模型 - An EOQ Model of Production with Time-varying Demand under Different Backlogging Rate increasing the liquid production for non response wells;
短缺量拖后率不相同时的边生产边需求EOQ模型对生产时率低、正见效或待见效井,适时提液。 - The results show that when the backlogging is not allowed, the implementation of VMI makes the system a lower cost.
研究结果表明,在不允许缺货时,实施VMI模式使得系统费用降低。